Sample Lines / Material Takeoffs | Autodesk AutoCAD Civil 3D 2020 - Earthwork Calculations


A very common task many designers and drafters are asked to do is to perform a Cut/Fill takeoff.  So, you just push a couple buttons, right?  WRONG!  Proper modeling of your existing ground and finished ground is key.  Selecting the right methods and understanding WHY you are performing that task may also be a good idea.

Here is a portion of an article our Consulting & Services Manager, Shawn Herring, wrote for AUGIWorld. This article looks at several options within Civil 3D for calculating and displaying your earthwork quantity takeoffs.

Sample Lines / Material Takeoffs



Sample Lines are simple to produce in Civil 3D, and many users produce them just to create section views.  But you are only a couple steps away from using those sample lines to compute materials for Cut, Fill, Refill and other roadway materials.  Two things needed prior to computing the materials.

1.       Create a DATUM Surface.  In your Corridor, be sure to create a DATUM surface for the bottom layer, or subgrade, of your model.
2.       Create Sample Lines – Be sure to sample at least your EG, your DATUM surface and your corridor model itself.

Once you have created your sample lines, select one of the sample lines and from the ribbon choose Compute Materials.  Your Materials List is defined within a style, as shown below.  In here you can apply Cut, Fill and Refill Factors if needed.

Quantity Takeoff Criteria in Autodesk AutoCAD Civil 3D 2020

·         CUT Factor – Commonly referred to as SWELL.  Expansion value as dirt that is typically in place, will have a greater volume once moved.
·         FILL Factor – Commonly referred to as SHRINKAGE.  As material compacts you typically need more than what your raw number states.

Note: For example, for a material that compacts to 93% of its original value when used as fill, enter 1.075 (which is derived by dividing 1.0 by .93) as the fill factor to compensate for the extra material that must be added.
·         REFILL Factor - As this factor depends on the cut material type and other considerations, it can run across a range. A heavy aggregate might have a Refill factor of 1.0, while fill cut from a rock ledge might have a Refill factor of 1.2. Not all cut material may even be reusable, as when it is cut from bog or marsh. The refill factor would then be 0.

Once your criteria style has been defined, simply map the Object Name to the proper Criteria/Material and select OK.

 Compute Materials in Autodesk AutoCAD Civil 3D 2020


Your material has been computed, but may look like nothing has happened.  You now need to choose how to display the data and this can be done in several different ways.

1.       Generate Volume Report
a.        This will display the calculations based on the Average End section method and give you volumes per station (based on Sample Line Interval) and a Total Cumulative Volume.
2.       Create a Total Volume Table
a.        Allows you to setup a table style and display all the data you would like.
3.       Display with Section Views as a Table
a.        If you have your section views imported, you can add a simple table to each view with the specified materials!

Comments

  1. Sample Lines / Material Takeoffs >>>>> Download Now

    >>>>> Download Full

    Sample Lines / Material Takeoffs >>>>> Download LINK

    >>>>> Download Now

    Sample Lines / Material Takeoffs >>>>> Download Full

    >>>>> Download LINK Cx

    ReplyDelete

Post a Comment